Standards

ISED publishes RSS-193 Issue 2 for flexible use broadband equipment

ISED Canada has released RSS-193 Issue 2, adding technical requirements for flexible use broadband equipment in the 24.25-27.5 GHz and 37.6-40.0 GHz bands.

What changed in RSS-193 Issue 2?

ISED Canada published Issue 2 of RSS-193 on October 29, 2026. The primary change from Issue 1 (which was published on July 11, 2025) is the addition of technical requirements for flexible use broadband equipment operating in the 24.25-27.5 GHz and 37.6-40.0 GHz bands. The standard applies to base stations, fixed service equipment, and subscriber equipment used in fixed and/or mobile services.

What is the transition period and effective date?

The standard came into force upon its publication on October 29, 2026. ISED provides a transition period of six months from the publication date. During this window, certification applications under either Issue 1 or Issue 2 will be accepted. After the transition period ends, only applications for certification under Issue 2 will be accepted, and all equipment manufactured, imported, distributed, leased, offered for sale, or sold in Canada must comply with Issue 2.

What are the key technical requirements?

Equipment subject to this standard is classified as Category I and must be certified, requiring either a technical acceptance certificate (TAC) from ISED's Certification and Engineering Bureau (CEB) or a certificate from a recognized certification body (CB). Equipment must use digital modulation and comply with specific maximum power limits:

Unwanted emissions outside the frequency block or block group must not exceed -5 dBm/MHz (for offsets ≤ 10% of occupied bandwidth) or -13 dBm/MHz (for offsets > 10% of occupied bandwidth). Additionally, base stations and mobile subscriber equipment operating in the 24.25-27.5 GHz range face strict unwanted emission limits within the 23.6-24.0 GHz band, capped at -39 dBW/200 MHz for base stations and -35 dBW/200 MHz for mobile subscriber equipment.

Are there new labeling requirements?

Yes. Base station equipment operating in the 24.45-24.65 GHz band must include a specific statement on the equipment label or in the user manual. The required text is: "Operation within 24.45-24.65 GHz is intended for indoor use only".

Bottom Line

Manufacturers of flexible use broadband equipment for the Canadian market have a six-month transition window from October 29, 2026, to update their certification filings to RSS-193 Issue 2.

Sources