1991–2026 · Utah / Colorado

Utah and Mountain West EMC test labs, 1991–2026: who tested here and where they went

A timeline of the independent EMC labs that served Utah manufacturers, from CCL's 1991 OSHA recognition through the 2015 Nemko-CCL fire to VPI ending FCC and CE testing in 2026, with the Colorado lab that became Element Longmont.

Directories, supplier lists and old test reports still send Utah manufacturers to labs that no longer exist, or that no longer do regulatory testing. This page puts the record in one place. Each entry below links to a longer article where we have one, and every date traces to the sources listed at the end.

What happened to Utah's EMC test labs?

What happened to Colorado's largest EMC lab?

EMC Integrity, which Interference Technology described as the largest EMC test laboratory in Colorado, sat between Denver, Boulder and Fort Collins. National Technical Systems (NTS) acquired it, with the deal reported in January 2016, and the Longmont lab traded as NTS Longmont. In September 2022 Element Materials Technology acquired NTS, and the lab now operates as Element Longmont. Links to the old emcintegrity.com site no longer lead to the lab.

Why do so many directories still list these labs?

Lab lists are rarely maintained. Government and trade directories collect entries over years and seldom remove them, and acquisitions break them in quiet ways: the listed name changes, the old domain stops resolving or redirects to a parent company, and the address on file becomes an office with no chamber in it. The test that matters is whether a lab is in the FCC's current list of recognized test firms with a scope that covers your product, not whether it appears in a directory.

How do I check whether a lab can still test my product?

  1. Look the lab up in the FCC Equipment Authorization System test-firm search and confirm it is listed today, with its designation number.
  2. Read the lab's scope of accreditation and confirm it lists the rule parts and test methods your product needs, for example Part 15 Subpart C with ANSI C63.10.
  3. Ask where the test will actually be performed. A listed address can be a sales office, and radiated testing may happen at a separate site.
  4. For FCC certification, the testing lab must be FCC-recognized and accredited for that scope under 47 CFR 2.948. Products going through Supplier's Declaration of Conformity do not need a recognized lab.
Sources
More Utah history